
ENI Abo 12 Phase 3 Development
menu opisówka
17th April 2013
ENI Abo 12 Phase 3 Development
JDR supplied a 1.55 km electro-hydraulic steel tube hybrid umbilical for ENI’s Abo 12 Phase 3 project in Nigeria, connecting a Subsea Distribution Unit to a new well. The project included fast-track design, manufacture, and Nigerian content training.