Leading the Development of Submarine Power Cable Solutions for Offshore Renewable Energy

JDR Cable Systems is a global leader in providing power and control solutions for the offshore energy sector. With over 30 years of expertise, JDR specializes in the design, manufacture, installation, and support of subsea power cables and umbilical systems worldwide.

As a pioneer in inter-array cable supply for offshore wind, wave, and tidal energy, JDR is renowned for its innovation and client-focused approach. With manufacturing facilities in Hartlepool (UK), Littleport (UK), and Bydgoszcz (PL), JDR is committed to delivering high-performance solutions for the most complex offshore energy challenges.

makieta.jpg
numeryok.jpg [5.47 KB]  HVAC STATIC ARRAY CABLE numeryok3.jpg [5.80 KB]  HVAC STATIC EXPORT CABLE numeryok5.jpg [5.74 KB]  HVDC STATIC INTERCONNECTION AND EXPORT CABLE
numeryok2.jpg [5.68 KB] HVAC INTERCONNECTION (SEA CROSSING)    CABLE numeryok4.jpg [5.68 KB] HVAC DYNAMIC ARRAY/ EXPORT CABLE numeryok6.jpg [5.83 KB] HV LAND CABLE (UP TO 400kV)

 

JDR's Cables Typical Constructions

JDR's Cables Typical Constructions

Static Array
Dynamic Array/Export
Interconnection

Static Array Cable

Conductor: Market leading semiconductive longitudinal water blocking solution for superior performance.
Insulation system: JDR XLPE ‘wet capable’ insulation system with low operating losses.
Metallic screen: Advanced screen design with optional watertight radial water barrier layer including market leading longitudinal water blocking solution.
Power core sheath: Rugged and resistant to the demands of installation with integrated semiconductive layer to facilitate oversheath integrity testing where the jacket is insulating.
Bundle assembly: Advanced production of the laid up bundle to long lengths without factory joints, including various filler options and FOC solutions that are DTS capable.
Strength member package: High strength, high coverage armouring to meet the challenging demands of the offshore environment with optional low loss variant.
Outer layer: Durable outer rovings with customisable identification stripe(s).

cable offshore 2.jpg
cross section offshore.jpg

Dynamic Array/Export Cable

Conductor: Market leading semiconductive longitudinal water blocking solution for superior performance.

Insulation system: High-performance super clean XLPE insulation.

Metallic screen: Advanced screen design including market leading longitudinal water blocking solution.

Power core sheath: Rugged and resistant to the demands of installation with integrated semiconductive layer to facilitate oversheath integrity testing where the jacket is insulating.

Bundle assembly: Advanced production of the laid up bundle to, including various filler options and FOC solutions that are DTS capable. Includes extruded armouer bedding for maximum protection.

Strength member package: Torque balanced, high strength, high coverage armouring to meeting the challenging demands of the offshore environment with optional low loss variant.

Outer layer: Durable outer jacket with customisable identification stripe.

cable energy 2.jpg

Interconnection (sea crossing) Cable

Conductor: Market leading semiconductive longitudinal water blocking solution for superior performance.

Insulation system: High-performance super clean XLPE insulation.

Metallic screen: Lead alloy watertight screen design including market leading longitudinal water blocking solution.

Power core sheath: Rugged and resistant to the demands of installation with integrated semiconductive layer to facilitate oversheath integrity testing where the jacket is insulating.

Bundle assembly: Advanced production of the laid up bundle to eliminate or minimize number of factory joints, including various filler options and FOC solutions that are DTS capable.

Strength member package: High strength, high coverage armouring to meeting the challenging demands of the offshore environment with optional low loss variant.

Outer layer: Durable outer rovings with customisable identification stripe(s).

INTERCONENCTOR_SEA_CROSSING MODEL.jpg

JDR's Role in Offshore Wind and Future Projects

JDR Cable Systems, in collaboration with TFKable, plays an integral role in the global energy transition, supplying subsea cables for major offshore wind projects. Over the past 15 years, JDR has delivered over 4,000 km of subsea cables, enabling global offshore wind power transmission. As an early innovator in 66 kV inter-array cables, JDR has helped integrate larger turbines, enhancing efficiency and reducing costs. Additionally, JDR pioneered dynamic power cables for floating offshore wind farms, solidifying its leadership in next-generation offshore energy solutions.

In 2024, JDR completed the type test qualification for its 132 kV static array cable, designed for next-generation offshore wind turbines. Developed with support from the Offshore Wind Growth Partnership and in collaboration with leading material suppliers, this technology was tested at the Offshore Renewable Energy Catapult. It will be produced at JDR’s upgraded Hartlepool facility and its new high-voltage manufacturing plant in Cambois, near Blyth, Northumberland. The 132 kV technology, which doubles the voltage of the 66 kV industry standard, improves energy transmission, reduces costs, and lowers clean energy prices for consumers.

image.png

Innovating for Global Offshore Wind Energy

JDR’s extensive experience spans some of the world’s most prominent offshore renewable energy projects, including East Anglia One, Formosa, Vineyard Wind, and London Array wind farms. The company also played a key role in developing subsea systems for Wave Hub, the largest open-access site for testing offshore renewable technologies. JDR’s submarine power cable solutions have been successfully deployed across regions, from Taiwan to the USA.

JDRHartNo2HIRES-3379.jpg

Building Strong Customer Connections

JDR collaborates closely with clients throughout the project lifecycle to deliver tailored, high-performance solutions. This client-focused approach ensures that JDR stays ahead of industry trends and supports clients in remaining at the forefront of offshore renewable energy.

image.png

Offshore Wind Industry Solutions

JDR Cable Systems is committed to advancing next-generation array cables to meet the increasing demand for higher-capacity, efficient power transmission in the offshore wind sector. With support from the Offshore Wind Growth Partnership (OWGP), JDR is at the forefront of innovation, introducing new materials and technologies to reduce costs and boost the performance of offshore wind projects.

image.png

renewables 8

Driving Long-Term Industry Development

JDR continues to invest in the future of offshore renewable energy. Key areas of focus include:

• DECC-supported initiatives to enhance high-voltage inter-array cables.

• Research into dynamic ratings for optimized conductor sizing and reduced material costs.

• Transferring oil and gas technology to offshore wind, including pre-terminated inter-array cables.

End-to-End Solutions Across the Offshore Renewables Lifecycle

End-to-End Solutions Across the Offshore Renewables Lifecycle

JDR provides a full range of services across all stages of the offshore renewable energy lifecycle—from initial design to manufacturing, installation, and ongoing lifecycle support.

Front-End Engineering & Design

Front-End Engineering & Design

JDR’s engineering team collaborates closely with clients from the early stages of project design, ensuring the most reliable and efficient cable systems. Key offerings include inter-array cable design, accessories, and innovative coilable sheathed cable solutions.

Project Execution & Management

Project Execution & Management

JDR’s project management team ensures projects are delivered on time, within budget, and to the highest standards. The company’s adaptable support structures allow for flexibility and ensure that projects meet evolving client needs during every phase.

Advanced Manufacturing

Advanced Manufacturing

JDR’s facilities in Hartlepool (UK), Bydgoszcz (Poland), and Cambois (UK) provide efficient production of high-quality subsea cables, with the capacity to produce up to 4000 tonnes of subsea cables and advanced storage solutions, optimizing reliability and cost-effectiveness.

Specialist Field Services

Specialist Field Services

JDR offers a variety of installation support services, including pre-commissioning, cable pull-in, termination and testing, cable repairs, and maintenance services. These services are performed to the highest quality standards by highly skilled field service technicians to achieve an efficient installation program and ensure reliable operation for the life of the assets.

renewables7

Next-Generation Array Cables

JDR’s next-generation array cable project focuses on the design and production of cutting-edge cables to power future offshore wind turbines. Key innovations include:

  • 66 kV Array Cables: With 1200 mm² conductor sizing in copper and aluminium, these cables provide increased capacity and efficiency for offshore wind farms.
  • 132 kV Export/Array Cable Prototypes: With 800 mm² conductors, these cables are engineered for turbines at 14 MW and beyond, enabling improved power transmission over longer distances with reduced energy losses.

These advancements are essential for meeting the power needs of next-generation turbines and optimizing offshore wind farm efficiency.

image.png

Impact and Achievements

  • 2023: Launched the 66 kV, 1200 mm² array cables.
  • 2024: Completed type-test qualification for the 132 kV, 800 mm² export/array cable.
  • Expanded JDR’s product portfolio, opening new opportunities in the subsea high-voltage cable market.
  • Announced the construction of a new, state-of-the-art manufacturing facility in Cambois, near Blyth, Northumberland.
image.png

The Journey: A Commitment to Innovation and Growth

Since entering the offshore wind market in 2009, JDR has continually adapted to meet industry demands. The company pioneered the transition from 33 kV to 66 kV array cables, enabling significant cost reductions. As demand for higher-capacity cables grew, JDR responded by developing solutions for next-generation turbines, integrating advanced materials and designs into its product offerings.

Looking ahead, JDR is investing in the future with the construction of a new state-of-the-art manufacturing facility in Cambois, Northumberland, increasing production capacity to meet the growing demand for high-voltage subsea cables.

image.png

Key achievements and advancements in JDR’s contributions to renewables technology

ikona podwojna-01.jpg
Hywind Tampen

JDR delivered 11 x 66kV 800mm² Copper Wet-Design Dynamic Array Cables for the world’s largest floating offshore wind power plant with 11 turbines. The deployment followed extensive research, development, and validation testing, offering valuable insights into cable lifetime and advancing dynamic cable technology for future large-scale floating wind power plants.

2023
ikona 1ok-01.jpg
66kV 1200mm² Cu

JDR’S Next Generation Array Cable project aims to develop a fully qualified innovative 66kV 1200mm² copper static array cable, semi-wet design including Jointing technology. This coupled with the completed 66kV 1200mm² aluminium design delivers cable performance flexibility, a key enabler for the use of larger offshore wind turbines.

2023
ikona 1ok-01.jpg
Hornsea Two– 66kV Cables and Resonant Offshore String Testing

JDR supplied 66kV Wet Design array cables for the world’s largest offshore wind farm. The Offshore Test Team demonstrated the efficiency of JDR’s Resonant Testing System, saving significant time and money, and earning JDR a supplier award for exceptional performance.

2022
ikona 1ok-01.jpg
33kV 800mm² Aluminium Factory Flexible Joints

JDR qualified and received type test approval for an 800mm² TiG welded aluminum conductor and an improved aluminum foil barrier layer jointing technology.

2020
ikona podwojna-01.jpg
East-Anglia One

JDR’s initial large-scale 66kV cable project featuring the first deployment of 66kV Wet-Design Cu.

2017
ikona 1ok-01.jpg
Carbon Trust Offshore Wind Technology Accelerator - 66kV Cable System Type Testing

In an innovation competition, JDR received funding from the Carbon Trust to conduct a full system type test, showcasing their 66kV lead-free cable and connectors technology. The project was successfully completed ahead of the first 66kV array cable demonstration projects.

2016
ikona 1ok-01.jpg
DECC 66kV Array Cable Development

JDR received research funding from the UK Department of Energy and Climate Change (now DESNZ) to explore lead-free 66kV cable technologies. The aim was to reduce offshore wind costs and facilitate the use of turbines exceeding 6MW. JDR successfully conducted long-term water immersion testing and qualified the nextgeneration 66 kV array cables.

2015
ikona 1ok-01.jpg
33kV Rigid Repair Joints

JDR qualified rigid repair joints and field-installable transition joints as a contingency measure in case of offshore cable damage during installation.

2014
ikona 1ok-01.jpg
33kV Induction Brazed Factory Flexible Joints

To address the growing demand for larger turbines exceeding 3-4MW, JDR developed qualified factory flexible joints using induction brazing technology to accommodate increased power transmission and cable length.

2014
ikona 2 ok-01.jpg
London Array

JDR delivered 200km of 33kV copper cables (150 and 500mm²) connecting 175 turbines to the offshore substation for the world’s largest offshore windfarm at the time.

2010
ikona podwojna-01.jpg
Beatrice Demonstrator

JDR supplied 3.5km of 33kV 70mm² copper cabling to connect two 5MW demonstration turbines to an oil and gas platform in 50m water depth. This project allowed JDR to enter the offshore renewable energy cable market leveraging their expertise in oil and gas technology.

2007
ikona 1ok-01.jpg
66kV 1200mm² Al

JDR have successfully designed, manufactured and qualified a 66kV 1200mm² aluminium renewable energy cable with a water tree retardant insulation. This advancement enables JDR to support the increasing market demand for this product delivering large capacity, high quality power management cable systems.

2023
ikona 3 ok-01.jpg
Patent Granted - Cable Release/ Breakaway Device

JDR secured a patent in the US, UK, Taiwan, and other countries for an innovative cable breakaway device, ensuring the safe disconnection of a cable from a floating turbine in emergency situations to safeguard offshore generation assets.

2023
ikona 3 ok-01.jpg
Patent Granted - Cable Transition Joint

JDR obtained a patent in the US, UK, and other countries for innovative cable technology addressing conductor and dielectric cross-section changes, with potential cost reduction for longer-length platform-to-platform cables.

2022
ikona podwojna-01.jpg
Windfloat

JDR provided three 66kV 185mm² Copper Wet-Design Dynamic Array Cables for the world’s largest floating offshore wind power plant in the deepest water. The Windfloat project marks the first offshore use of 66kV dynamic array cables.

2019
ikona 1ok-01.jpg
Carbon Trust Renewable Energy Technology Accelerator (RETA) - Smart Cable

JDR obtained a research grant to test distributed strain monitoring technology on a „Smart” cable. The research and prototype testing enhanced industry understanding of how optical fibers can provide valuable information on the environmental loading experienced by dynamic cables.

2016
ikona podwojna-01.jpg
European Offshore Wind Deployment Centre – Aberdeen Bay - Vattenfall

JDR provided their inaugural 66kV array cables for Vattenfall’s Aberdeen Bay demonstration project, among the first globally to employ 66kV as the array cable system voltage.

2016
ikona podwojna-01.jpg
Floatgen Sem-Rev

JDR provided their initial dynamic renewable energy cables for the Floatgen 2MW offshore test site near Brittany, France.

2015
ikona podwojna-01.jpg
Nordsee One - Aluminium Conductor, Coilable Cables

JDR introduced Aluminum Conductors and Coilable Roved Cables, revolutionizing Array Cable supply by enabling cable baskets. This innovation significantly reduced supply and installation costs, and enabled greater offshore flexibility compared to drum deployment.

2014
ikona 3 ok-01.jpg
Patent - Cable Hang-off Termination

JDR secured US and UK patents for their innovative hang-off termination unit, significantly reducing offshore cable installation and commissioning time.

2012
ikona 2 ok-01.jpg
Greater Gabbard

JDR provided 200km of 33kV copper cables (95, 185, and 400mm²) to connect 140 turbines in strings to the offshore substation. The Hartlepool factory has been opened, and its initial operations were dedicated to manufacturing cables for the Greater Gabbard project.

2009
2023
Hywind Tampen

JDR delivered 11 x 66kV 800mm² Copper Wet-Design Dynamic Array Cables for the world’s largest floating offshore wind power plant with 11 turbines. The deployment followed extensive research, development, and validation testing, offering valuable insights into cable lifetime and advancing dynamic cable technology for future large-scale floating wind power plants.

ikona podwojna-01.jpg
2023
66kV 1200mm² Al

JDR have successfully designed, manufactured and qualified a 66kV 1200mm² aluminium renewable energy cable with a water tree retardant insulation. This advancement enables JDR to support the increasing market demand for this product delivering large capacity, high quality power management cable systems.

ikona 1ok-01.jpg
2023
66kV 1200mm² Cu

JDR’S Next Generation Array Cable project aims to develop a fully qualified innovative 66kV 1200mm² copper static array cable, semi-wet design including Jointing technology. This coupled with the completed 66kV 1200mm² aluminium design delivers cable performance flexibility, a key enabler for the use of larger offshore wind turbines.

ikona 1ok-01.jpg
2023
Patent Granted - Cable Release/ Breakaway Device

JDR secured a patent in the US, UK, Taiwan, and other countries for an innovative cable breakaway device, ensuring the safe disconnection of a cable from a floating turbine in emergency situations to safeguard offshore generation assets.

ikona 3 ok-01.jpg
2022
Hornsea Two– 66kV Cables and Resonant Offshore String Testing

JDR supplied 66kV Wet Design array cables for the world’s largest offshore wind farm. The Offshore Test Team demonstrated the efficiency of JDR’s Resonant Testing System, saving significant time and money, and earning JDR a supplier award for exceptional performance.

ikona 1ok-01.jpg
2022
Patent Granted - Cable Transition Joint

JDR obtained a patent in the US, UK, and other countries for innovative cable technology addressing conductor and dielectric cross-section changes, with potential cost reduction for longer-length platform-to-platform cables.

ikona 3 ok-01.jpg
2020
33kV 800mm² Aluminium Factory Flexible Joints

JDR qualified and received type test approval for an 800mm² TiG welded aluminum conductor and an improved aluminum foil barrier layer jointing technology.

ikona 1ok-01.jpg
2019
Windfloat

JDR provided three 66kV 185mm² Copper Wet-Design Dynamic Array Cables for the world’s largest floating offshore wind power plant in the deepest water. The Windfloat project marks the first offshore use of 66kV dynamic array cables.

ikona podwojna-01.jpg
2017
East-Anglia One

JDR’s initial large-scale 66kV cable project featuring the first deployment of 66kV Wet-Design Cu.

ikona podwojna-01.jpg
2016
Carbon Trust Renewable Energy Technology Accelerator (RETA) - Smart Cable

JDR obtained a research grant to test distributed strain monitoring technology on a „Smart” cable. The research and prototype testing enhanced industry understanding of how optical fibers can provide valuable information on the environmental loading experienced by dynamic cables.

ikona 1ok-01.jpg
2016
Carbon Trust Offshore Wind Technology Accelerator - 66kV Cable System Type Testing

In an innovation competition, JDR received funding from the Carbon Trust to conduct a full system type test, showcasing their 66kV lead-free cable and connectors technology. The project was successfully completed ahead of the first 66kV array cable demonstration projects.

ikona 1ok-01.jpg
2016
European Offshore Wind Deployment Centre – Aberdeen Bay - Vattenfall

JDR provided their inaugural 66kV array cables for Vattenfall’s Aberdeen Bay demonstration project, among the first globally to employ 66kV as the array cable system voltage.

ikona podwojna-01.jpg
2015
DECC 66kV Array Cable Development

JDR received research funding from the UK Department of Energy and Climate Change (now DESNZ) to explore lead-free 66kV cable technologies. The aim was to reduce offshore wind costs and facilitate the use of turbines exceeding 6MW. JDR successfully conducted long-term water immersion testing and qualified the nextgeneration 66 kV array cables.

ikona 1ok-01.jpg
2015
Floatgen Sem-Rev

JDR provided their initial dynamic renewable energy cables for the Floatgen 2MW offshore test site near Brittany, France.

ikona podwojna-01.jpg
2014
33kV Rigid Repair Joints

JDR qualified rigid repair joints and field-installable transition joints as a contingency measure in case of offshore cable damage during installation.

ikona 1ok-01.jpg
2014
Nordsee One - Aluminium Conductor, Coilable Cables

JDR introduced Aluminum Conductors and Coilable Roved Cables, revolutionizing Array Cable supply by enabling cable baskets. This innovation significantly reduced supply and installation costs, and enabled greater offshore flexibility compared to drum deployment.

ikona podwojna-01.jpg
2014
33kV Induction Brazed Factory Flexible Joints

To address the growing demand for larger turbines exceeding 3-4MW, JDR developed qualified factory flexible joints using induction brazing technology to accommodate increased power transmission and cable length.

ikona 1ok-01.jpg
2012
Patent - Cable Hang-off Termination

JDR secured US and UK patents for their innovative hang-off termination unit, significantly reducing offshore cable installation and commissioning time.

ikona 3 ok-01.jpg
2010
London Array

JDR delivered 200km of 33kV copper cables (150 and 500mm²) connecting 175 turbines to the offshore substation for the world’s largest offshore windfarm at the time.

ikona 2 ok-01.jpg
2009
Greater Gabbard

JDR provided 200km of 33kV copper cables (95, 185, and 400mm²) to connect 140 turbines in strings to the offshore substation. The Hartlepool factory has been opened, and its initial operations were dedicated to manufacturing cables for the Greater Gabbard project.

ikona 2 ok-01.jpg
2007
Beatrice Demonstrator

JDR supplied 3.5km of 33kV 70mm² copper cabling to connect two 5MW demonstration turbines to an oil and gas platform in 50m water depth. This project allowed JDR to enter the offshore renewable energy cable market leveraging their expertise in oil and gas technology.