Anyala & Madu

menu opisówka

19th September 2020

Anyala & Madu

The Anyala and Madu fields are located within the OML 83 and 85 leases in the shallow waters of the Niger Delta, approximately 40 km off the coast of Bayelsa State, Nigeria. The fields are estimated to contain a total of 193 million barrels of oil (MMbbl) and 0.637 trillion cubic feet of gas.

As part of the Anyala & Madu project, JDR supplied a total of 23.7 km of umbilicals, including power and control umbilicals that connect the FPSO to the Madu and Anyala fields, as well as the Subsea Isolation Valve (SSIV). The cables and SSIV were manufactured at JDR's facilities in Littleport and Hartlepool, UK. These supplied cables will contribute to optimising gas extraction costs from the Anyala and Madu fields and will be directed to a gas processing hub to meet the local market's needs.